Adaptive Reuse in Oklahoma City, OK at U-Haul at 39th Expressway

Histoire du bâtiment

There are iconic gas stations that are uniquely nostalgic to many Americans and DX brand is one of those chains of gas stations. In 1968, Sun Oil Co. merged with Sunray DX Oil Company and began marketing petroleum gasoline under the DX brand name in a few midwestern states. Sunray DX-Oil Company would famously patent an upper-cylinder lubricant which was added to their gasoline and then given the iconic brand name "D-X" and "D-X Lubricating Motor Fuel". Sun Oil Co. continued marketing D-X gasoline using both the Sunoco and DX brands all the way into the 1980s. Not wanting to let such an iconic gas station fall into ruins, U-haul acquired the historic property in 1977. This particular DX station was originally built in 1958. U-Haul has also acquired and saved many more abandoned DX stations across the country.

Impact environnemental

Au service des clients depuis 1977, cet emplacement a été construit par réutilisation adaptative d'un bâtiment abandonné. La réutilisation adaptative favorise l'aménagement intercalaire dans le but de renforcer les communautés. Parmi les bienfaits obtenus, la réutilisation a permis d'éviter :

  • la fabrication et le transport de 14 tonnes de métal
  • 672 tons of new concrete pours avoided
  • 689,4 tons of construction and demolition debris prevented

Energy-efficiency and waste-reduction programs at this facility provide the following estimated benefits each year for this Kansas City community:

  • réaliser des économies de 16 740 kWh par année
  • prévenir l'émission de 336 605 lb de gaz à effet de serre
  • Utilisation de l'acier

    Production de l'acier La fabrication et le transport de 14 tonnes (13 tonnes métriques) d'acier ont été évités à ce jour

  • Consommation d'énergie

    Énergie Économies de 16 740 kWh par année

  • Utilisation du béton

    Concrete 672 tons (610 tonnes) of new concrete pours avoided to date

  • Émissions de CO2

    Émissions Émissions de 336 605 lb (152 683 kg) de gaz à effet de serre évitées

  • Débris pour les sites d'enfouissement

    Landfill Debris 689 lbs (626 kgs) of construction debris prevented

Liens connexes

Galerie de photos