Adaptive Reuse in Jersey City, NJ at U-Haul Moving & Storage of Jersey City

Histoire du bâtiment

Adam Black opened opened his first blacksmith and wagon building shop, Black Build Bodies, in Jersey City in 1886. The shop quickly grew to specialize in horse-drawn commercial vehicles and heavy-duty trucks. Eventually Adam's three sons, Edward, Clarence, and Frederick were recruited to join the family business to keep up with growth. After his sons joined the company, the business was then renamed Adam Black & Sons. The shop was also an authorized Mid-West Body and Anthony Hydraulic Hoists dealer during the 1940's and 50's. Being a community oriented business, they specially built a truck-mounted swimming pool and donated it to the Jersey City Rotary for public use in the 1950's. Unfortuantely, the business struggled during the economic downturn in the late 1970's and had to close its doors in 1983. The Black Build Bodies building was built in 1929 and U-Haul acquired the building in 1983. 

Impact environnemental

Au service des clients depuis 1983, cet emplacement a été construit par réutilisation adaptative d'un bâtiment abandonné. La réutilisation adaptative favorise l'aménagement intercalaire dans le but de renforcer les communautés. Parmi les bienfaits obtenus, la réutilisation a permis d'éviter :

  • la fabrication et le transport de 44 tonnes de métal
  • le coulage de 3 030 tonnes de nouveau béton
  • 3 074 tonnes de débris de construction et de démolition

Energy-efficiency and waste-reduction programs at this facility provide the following estimated benefits each year for this Jersey City community:

  • réaliser des économies de 171 452 kWh par année
  • 1 489 364 livres d'émissions de gaz à effet de serre
  • Utilisation de l'acier

    Production de l'acier La fabrication et le transport de 44 tonnes (40 tonnes métriques) d'acier ont été évités à ce jour

  • Consommation d'énergie

    Énergie Économies de 171 452 kWh par année

  • Utilisation du béton

    Béton Coulage de 3 030 tonnes (2 750 tonnes) de nouveau béton évité à ce jour.

  • Émissions de CO2

    Emissions 1 489 364 lbs (675 571 kgs) of greenhouse gas emissions prevented

  • Débris pour les sites d'enfouissement

    Débris pour les sites d'enfouissement 3 074 lb (2 789 kg) de débris de construction ont été évitées

Retour
Haut de la page