The 11-acre site at 9082 Tecumseh Road formerly held an automobile bumper manufacturing plant called Wickes Windsor Bumper. The first Wickes Bumper plant was built in 1952 in Windsor, Ontario and provided a great number of jobs for the local community. After almost 40 years in business, the factory officially shut down in 1990. The building sat empty for 25 years until U-Haul purchased the property in 2015. One year prior to the purchase, the factory was a victim of arson, resulting in $1 million in fire damages and nearly leaving the structure in decay.  

U-Haul's purchase and rehabilitation of the abandoned site, has turned a community eyesore into a valuable amenity of self-storage and truck sharing. La réutilisation adaptative des bâtiments permet à U-Haul de promouvoir l'aménagement intercalaire pour répondre aux besoins des citoyens tout en préservant les ressources naturelles et les terrains normalement nécessaires à une construction neuve. La réutilisation adaptative permet également de concentrer les ressources sur l'intégration d'éléments respectueux de l'environnement dans le bâtiment existant plutôt que de créer des déchets par la démolition et d'utiliser des ressources précieuses pour de nouvelles constructions.

Impact environnemental

Serving U-Haul customers since 2015, this facility was built through adaptive reuse of an abandoned building. La réutilisation adaptative favorise l'aménagement intercalaire dans le but de renforcer les communautés. Parmi les bienfaits obtenus, la réutilisation a permis d'éviter : 

  • 279 tonnes of metal manufacturing & transportation prevented 
  • 7 124 tonnes of new concrete pours avoided 
  • 7 607 tonnes of construction and demolition debris prevented 

Energy-efficiency and waste-reduction programs at this facility provide the following estimated benefits each year for the Windsor community: 

  • 1,984,906 kg greenhouse gas emissions prevented 
  • Utilisation de l'acier

    Production de l'acier La fabrication et le transport de 279 tonnes (253 tonnes métriques) d'acier ont été évités à ce jour

  • Utilisation du béton

    Béton Coulage de 7 853 tonnes (7 126 tonnes) de nouveau béton évité à ce jour.

  • Émissions de CO2

    Emissions 1 984 906 lbs (900 347 kgs) of greenhouse gas emissions prevented

  • Débris pour les sites d'enfouissement

    Débris pour les sites d'enfouissement 7 607 lb (3 451 kg) de débris de construction ont été évitées